Public Improvement Standards

Standards for Public Improvements (Effective 9/2008)

 

Click below to Download Adobe PDF Files

Complete Design Manual (1.6 MB, details excluded)
 

Amendment to Design Manual Section 4.6 Hydrology Methods, page 32: Drainage analysis shall utilize the updated precipitation data as published by the NOAA and in accordance with the ConnDOT Drainage Manual as revised to date.  The updated precipitation estimates for Glastonbury can be found here.

 

Standard Details

Click below to Download Adobe PDF Files Revision Date
Plates #1-17 Roadway and Roadside Details 3/2017
Plates #20-27 Storm Drainage Details 3/2017

Plates #30-49Sanitary Sewer Details

3/2017

 

 Plan Review Checklist

 Click below to Download Adobe PDF Files  Click below to Download Word Doc Files  Revision Date
 TOG Plan Review Checklist PDF TOG Plan Review Checklist Word  5/24/2017

 

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer