Stormwater Management Plan

Stormwater Management Plan

The Connecticut Department of Energy and Environmental Protection issued an updated "General Permit for the Discharge of Storm water from Small Municipal Separate Storm Sewer Systems"  (MS4 Permit) which took effect on July 1, 2017.  This permit regulates the discharge of storm water from all of the Town-owned and maintained drainage systems, and includes many new requirements related to such items as illicit discharge detection and elimination, water quality treatment for private developments that discharge into the town system, and increased inspection and maintenance requirements for public and private storm water infrastructure. A fact sheet describing the updated permit can be found here:  CT DEEP Fact Sheet

The Towns plan for compliance with this new permit is now available for review via this link:

 2017 Stormwater Management Plan

(The prior version of the stormwater management plan issued in 2004 can still be found here).

This plan includes six minimum control measures as required by the DEEP MS4 Permit including:

1. Public Education and Outreach
2. Public Participation
3. Illicit Discharge Detection and Elimination
4. Construction Site Run-off Control
5. Post-Construction Stormwater Management
6. Pollution Prevention / Good Housekeeping


Annual Reports

Also required under the DEEP MS4 General Permit is the requirement for the publishing of annual reports regarding progress toward the goals set in the Stormwater Management Plan.  The annual reports starting in 2018 can be found in the table below.  Prior annual reports and testing can be found here.

Description File Size, Type
2017 Annual Report  0.4MB PDF



Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer